MECHANICAL INSTALLATION
Note
NOTE
3 - 6
To insert the unit into the case:
1.
Ensure that the model number on the left side of the relay matches the
requirements of the installation.
2.
Raise the locking handle to the highest position.
3.
Hold the unit immediately in front of the case and align the rolling guide pins
(near the hinges of the relay's handle) with the case's guide slots.
4.
Slide the unit into the case until the guide pins on the unit have engaged the
guide slots on either side of the case.
5.
Once fully inserted, grasp the handle from its center and rotate it down from
the raised position towards the bottom of the relay.
6.
Once the unit is fully inserted the latch will be heard to click, locking the
handle in the final position. The unit is mechanically held in the case by the
handle's rolling pins, which cannot be fully lowered to the locked position until
the electrical connections are completely mated.
No special ventilation requirements need to be observed during the installation of the unit.
The unit does not require cleaning.
FIGURE 3: Sliding the unit out of the case
750 FEEDER MANAGEMENT RELAY – INSTRUCTION MANUAL
CHAPTER 3: INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

760

Table of Contents