PTP 250 User Guide
Chapter 2: Planning considerations
This chapter provides information to help the user to plan a PTP 250 link.
The following topics are described in this chapter:
•
Regulatory planning
regulatory restrictions that apply in the country of operation.
•
Site planning
the ODU and PoE power supply.
•
Link planning
links, such as range and path loss. Introduces the PTP LINKPlanner.
•
Planning for connectorized units
account when planning to use connectorized ODUs with external antennas in PTP 250
links.
•
Grounding and lightning protection
lightning protection requirements of a PTP 250 installation.
•
Data network planning
PTP 250 data networks.
•
Ordering components
PTP 250 link (as an alternative to PTP LINKPlanner). It specifies Motorola part
numbers for PTP 250 components.
phn-2182_003v004 (Oct 2011)
on page
2-2
describes how to plan PTP 250 links to conform to the
on page
2-6
describes factors to be considered when choosing sites for
on page
2-10
describes factors to be taken into account when planning
on page
on page
2-23
on page
2-24
UNDER DEVELOPMENT
2-12
describes factors to be taken into
on page
2-15
describes the grounding and
describes factors to be considered when planning
describes how to select components for a planned
2-1