Cabling and lightning protection
Further reading on cabling and lightning protection
For more information on cabling and lightning protection, refer to the following:
•
Maximum cable lengths
cables in PTP 250 installations.
•
Grounding and lightning protection
lightning protection requirements of a PTP 250 installation.
•
Ordering components
installations, including cables, connectors, grounding kits and LPUs.
•
Installing the drop cable and LPU
from the ODU to the LPU and PoE power supply, and to provide grounding for the
installation.
•
Installing the PoE power supply
cables to connect to the network.
•
Testing after a lightning strike
PTP 250 installation is struck by lightning.
1-16
on page
2-7
on page
2-24
on page
on page
on page
UNDER DEVELOPMENT
gives maximum permitted lengths of interface
on page
2-15
describes the grounding and
lists the components required for PTP 250
5-15
describes how to install the drop cable
5-29
describes how to prepare the indoor
8-2
describes testing to be performed after a
phn-2182_003v004 (Oct 2011)
Chapter 1: Product description