Preparing for installation

Preparing for installation
This section describes the checks to be performed before proceeding with the installation.

Unit pre-configuration

It is common practice to pre-configure the units during staging before site installation by
performing the following tasks from
Connecting to the unit
Upgrading firmware version
Using the installation wizard
If the units are to be pre-configured during staging, the safety precautions below MUST be
observed.

Safety precautions

All national and local safety standards must be followed while developing a site, installing
equipment, or performing maintenance.
Ensure that personnel are not exposed to unsafe levels of RF energy. The units
start to radiate as soon as they are powered up. Respect the safety standards
defined in
Compliance with safety standards
minimum separation distances.
Observe the following guidelines:
Never work in front of the antenna when the ODU is powered.
Always power down the PoE power supply when connecting and disconnecting the drop
cable from either the PoE power supply or ODU.

Protection requirements

The installation must meet the requirements defined in
on page 2-15.
5-2
Chapter 6: Configuration and
on page
6-3
on page
on page
UNDER DEVELOPMENT
6-10
6-13
on page 4-8, in particular the
Grounding and lightning protection
phn-2182_003v004 (Oct 2011)

Chapter 5: Installation

alignment:

Advertisement

Table of Contents
loading

Table of Contents