PTP 250 User Guide
Installing and grounding the drop cable at building entry
Perform this procedure to install and ground the drop cable and LPU at the building (or
cabinet) entry point
Figure 5-8 Grounding at building entry
phn-2182_003v004 (Oct 2011)
(Figure
5-8).
UNDER DEVELOPMENT
Installing the drop cable and LPU
5-27