2.5 TECHNICAL SPECIFICATIONS
2.5.2.14 BREAKER MAINTENANCE
2
KI
t Breaker Counters for Phases A, B, C
Breaker Openings Counter
Breaker Closings Counter
2
2.5.2.15 SWITCHGEAR
Switchgear
Snapshot Events
2.5.2.16 MAXIMUM NUMBER OF STARTS
Metering algorithm
Tripping time accuracy
Full load amps
Breaker supervision
Min. Stop time
Number of starts
Time to restart
Reset Counter
Snapshot events:
Operate time
2.5.2.17 DIGITAL COUNTERS
FUNCTION
Name
Preset
COMPARE
2.5.2.18 COLD LOAD PICKUP
Cold Outage time
Cold Blocking time
2-22
0.00 to 9999.99 in steps of 0.01 (kA)
0 to 9999 in steps of 1
0 to 9999 in steps of 1
1 to16 (configurable in "relay configuration" screen).
Selectable by setting (for each switchgear in "system setup")
Fundamental
±250ms or 5% whichever is greater
0.5 to 10.0 A in steps of 0.1
Selectable by setting
0.0 to 900.0 in steps of 0.1
0 to 10 in steps of 1
0 to 100 minutes in steps of 1
Selectable by setting
Selectable by setting
<45ms at 50Hz, typically
Disabled, Enabled
Any 12 alphanumeric characters
-2147483648, 0, +2147483647
-2147483648, 0, +2147483647
1 -1000 in steps of 1min
1-1000 in steps of 1s