Installation Precautions

Location and Ambient Requirements

The Toshiba ASD is intended for permanent installations only.
Installation should conform to the 2008 National Electrical Code — Article 110 (NEC)
(Requirements For Electrical Installations), all regulations of the Occupational Safety and
Health Administration, and any other applicable national, regional, or industry codes and
standards.
Select a mounting location that is easily accessible, has adequate personnel working space, and
adequate illumination for adjustment, inspection, and maintenance of the equipment (Refer to 2008
NEC Article 110-13).
DO NOT mount the ASD in a location that would produce catastrophic results if it were to fall
from its mounting location (Equipment damage or injury to personnel).
DO NOT mount the ASD in a location that would allow it to be exposed to flammable chemicals or
gases, water, solvents, or other fluids.
Avoid installation in areas where vibration, heat, humidity, dust, fibers, metal particles, explosive/
corrosive mists or gases, or sources of electrical noise are present.
The installation location shall not be exposed to direct sunlight.
Allow proper clearance spaces for installation. DO NOT obstruct the ventilation openings. Refer to
the section titled
requirements.
The ambient operating temperature range of the Q9 ASD is 14° to 104° F (-10° to 40° C).

Mounting Requirements

Only
Qualified Personnel
Install the unit in a secure and upright position in a well-ventilated area.
As a minimum, the installation of the equipment should conform to the 2008 National Electrical
Code — Article 110 (NEC), OSHA, as well as any other applicable national, regional, or industry
codes and standards.
Installation practices should conform to the latest revision of NFPA 70E Electrical Safety
Requirements for Employee Workplaces.
It is the responsibility of the ASD installer/maintenance personnel to ensure that the unit is installed
into an enclosure that will protect personnel against electric shock.
4
Installation and Connections on pg. 12
should install this equipment.
for further information on ventilation
Q9 ASD Installation and Operation Manual