The type of screws and nuts suited to lock the catches (1) are given in the chart.
Cat. Hook
1
2S
2
3S
3
4
Removing Equipment
Rest the implement on the ground and make sure that it
is stable. Remove the safety screws (3) fig. 4 from the
two hooks to free the catches (1) fig. 4. While sitting in
the driving seat, pull the control cable (1) to unhook the
third point (3) fig. 5. Slightly raise the implement, then
release the hook ends by pulling the control cables (2) fig.
5 directly from the driving position. Lower the lower arms
until the hooks are released.
Tapered profiles
Three second category ball-bushings are supplied for in-
stallation on the implement, if required. The ball-bushing
with projecting lips (1) should be installed on the imple-
ment upper hitch pin. The two plain ball-bushings (3) with
their detachable guides (2) should be installed on the im-
plement lower hitch pins.
The three-point linkage system enables connecting sec-
ond category implements.
It is recommended to respect the dimensions (C) and (D)
given in the table below in order not to damage the cou-
pler.
1. Top link pin
2. Lower lift arm pins
Dimensions
28 mm (1.1 in)
A
25.5 mm (1.0 in) 25.5 mm (1.0 in)
B
610 mm (24.0 in) 610 mm (24.0 in)
C
825 mm (32.5 in) 683 mm (26.9 in)
D
6 - WORKING OPERATIONS
UNI 5737 screw cl. 8.8
M6x40 opt. 7/32" x 1"1/2
M6x45 opt. 7/32" x 1"3/4
M8x50 opt. 5/16" x 2"
M8x55 opt. 5/16" x 2"1/8
M8x55 opt. 5/16" x 2"1/8
M8x65 opt. 5/16" x 2"1/2"
Categories
2
2N
28 mm (1.1 in)
6-34
UNI 7473 cl.6S nut
M6 opt. 7/32"
M6 opt. 7/32"
M8 opt. 5/16"
M8 opt. 5/16"
M8 opt. 5/16"
M8 opt. 5/16"
5
DCUTLNEIT046S6A
6
DCUTLNEIT043S6A
7
DCSPVEGB064S6A