Chapter 8: Operating Under The Fcc Unrestricted Contention Based Protocol; Scope Of This Chapter; Bringing Up A Link - Radwin 2000 C PLUS User Manual

Point to point broadband wireless
Hide thumbs Also See for 2000 C PLUS:
Table of Contents

Advertisement

Chapter 8:
Operating Under the FCC 
Unrestricted Contention Based 
Protocol
Scope of this Chapter
This chapter explains how to set up a RADWIN 5000 link operating under the FCC Unrestricted 
Contention Based Protocol (UCBP) in the 3.650‐3.7GHz band The detailed technical operation 
of the protocol is beyond the scope of this manual. A variety of publications on the subject 
are available from the relevant FCC Web site, http://wireless.fcc.gov/services/
index.htm?job=service_home&id=3650_3700. See also, http://hraunfoss.fcc.gov/
edocs_public/attachmatch/FCC‐05‐56A1.pdf.
Bringing up a link
The HBS for FCC UCBP is pre‐configured for this regulation only. Activation is the same as for 
other RADWIN 5000 products. Following activation, the HBS will find its HSUs in the usual 
way.The only additional requirements are two extra parameters to be set in the Configuration 
Air Interface tab:
RADWIN 2000 C Plus User Manual
Release 3.5.70
8‐1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2000 C PLUS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents