GE L90 Instruction Manual page 577

Ur series line current differential system
Hide thumbs Also See for L90:
Table of Contents

Advertisement

9 THEORY OF OPERATION
Relay 1: 0.38781 pu
0.26811°
Relay 2: 0.30072 pu
–
12.468°
Relay 3: 0.37827 pu
8.9388°
Since they have a common per-unit base, the composite voltages are used at all locations. The currents are ratio matched
using the tap settings.
For example, the composite current at relay 1 is 1.3839 pu of its local CT; that is, 1.3839 × 1200 A = 1.6607 kA. When cal-
culated at relay 2 from the data sent from relay 1 to relay 2, this value is 1.6607 kA / 1000 A = 1.6607 pu of the relay 2 CT.
This is due to the procedure of applying tap settings to the received phase currents before calculating the composite signal.
As a result, the three relays work with the following signals.
Table 9–37: COMPOSITE SIGNALS AT ALL THREE RELAYS
VALUE
RELAY 1
0.38781 pu 0.26811°
V
LOC(X)
0.30072 pu –12.468°
V
REM1(X)
0.37827 pu 8.9388°
V
REM2(X)
1.3839 pu –84.504°
I
LOC(X)
4.5704 pu –85.236°
I
REM1(X)
1.7033 pu –56.917°
I
REM2(X)
The line impedances entered in secondary ohms are recalculated as follows (refer to the previous sub-section for equa-
tions).
Table 9–38: PER-UNIT LINE IMPEDANCE
VALUE
RELAY 1
0.088509 pu 80.5°
Local to tap
0.15174 pu 80.5°
Remote 1 to tap
0.069551 pu 80.5°
Remote 2 to tap
Using the data in the previous two tables, the tap voltages are calculated as follows (refer to the previous sub-section for
equations).
Table 9–39: CALCULATED TAP VOLTAGES USING TERMINAL DATA
VALUE
RELAY 1
0.26581 pu 2.2352°
V
T(LOC)
0.39758 pu –178.9°
V
T(REM1)
0.26535 pu 2.4583°
V
T(REM2)
From the above table, it is already visible that:
Looking from relay 1 there is no fault between the tap and the local terminal and between the tap and remote 2 termi-
nal. Therefore, the fault must be between the remote 1 terminal = relay 2 and the tap.
Looking from relay 2 there is no fault between the tap and the remote 1 terminal, and between the tap and remote 2
terminal. Therefore, the fault must be between the local terminal = relay 2 and the tap.
Looking from relay 3 there is no fault between the tap and the remote 1 terminal, and between the tap and the local ter-
minal. Therefore, the fault must be between the remote 2 terminal = relay 2 and the tap.
Note that the correct value of the tap voltage is equal for all three relays. This is expected since the per-unit base for the
composite voltages is equal for all three relays.
The three relays calculate the differences as follows (refer to the previous sub-section for equations).
GE Multilin
RELAY 2
RELAY 3
0.30072 pu –12.468°
0.37827 pu 8.9388°
0.38781 pu 0.26811°
0.38781 pu 0.26811°
0.37827 pu 8.9388°
0.30072 pu –12.468°
5.4844 pu –85.236°
1.2775 pu –56.917°
1.6607 pu –84.504°
1.0379 pu –84.504°
2.0439 pu –56.917°
3.4278 pu –85.236°
RELAY 2
0.12644 pu 80.5°
0.073754 pu 80.5°
0.057957 pu 80.5°
RELAY 2
RELAY 3
0.39755 pu –178.9°
0.26535 pu 2.4583°
0.26582 pu 2.2351°
0.26581 pu 2.2352°
0.26535 pu 2.4587°
0.39758 pu –178.9°
L90 Line Current Differential System
9.6 FAULT LOCATOR
RELAY 3
0.092735 pu 80.5°
0.11801 pu 80.5°
0.20232 pu 80.5°
9
9-53

Advertisement

Table of Contents
loading

Table of Contents