GE L90 Instruction Manual page 290

Ur series line current differential system
Hide thumbs Also See for L90:
Table of Contents

Advertisement

5.6 GROUPED ELEMENTS
FLEXLOGIC OPERAND
PH DIST Z1 PKP AB
FLEXLOGIC OPERAND
PH DIST Z1 PKP BC
FLEXLOGIC OPERAND
PH DIST Z1 PKP CA
FLEXLOGIC OPERANDS
PH DIST Z1 SUPN IAB
PH DIST Z1 SUPN IBC
PH DIST Z1 SUPN ICA
OPEN POLE OP **
** D60, L60, and L90 only. Other UR-series models apply regular current seal-in for zone 1.
5
For phase distance zone 2, there is a provision to start the zone timer with other distance zones or loop the pickup
flag to avoid prolonging phase distance zone 2 operation when the fault evolves from one type to another or
migrates from the initial zone to zone 2. Desired zones in the trip output function should be assigned to accomplish
NOTE
this functionality.
5-160
SETTING
PH DIST Z1 DELAY
T
PKP
0
T
PKP
0
T
PKP
0
AND
AND
AND
Figure 5–71: PHASE DISTANCE ZONE 1 OP SCHEME
Figure 5–72: PHASE DISTANCE ZONE 2 OP SCHEME
L90 Line Current Differential System
AND
OR
AND
FLEXLOGIC OPERANDS
PH DIST Z1 OP
OR
OR
AND
OR
FLEXLOGIC OPERANDS
PH DIST Z1 OP AB
PH DIST Z1 OP BC
PH DIST Z1 OP CA
5 SETTINGS
837017A8.CDR
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents