7 TESTING

7.1 OVERVIEW

7 TESTING 7.1OVERVIEW

7.1.1 TEST SETUP

The purpose of this testing description is to demonstrate the procedures necessary to perform a complete functional test of
all the 469 hardware while also testing firmware/hardware interaction in the process. Since the 469 is packaged in a dra-
wout case, a demo case (metal carry case in which an 469 may be mounted) may be useful for creating a portable test set.
Testing of the relay during commissioning using a primary injection test set will ensure that CTs and wiring are correct and
complete.
7
Figure 7–1: SECONDARY INJECTION TEST SETUP
GE Multilin
469 Motor Management Relay
7-1
Courtesy of NationalSwitchgear.com