Suzuki LT-Z250 Service Manual page 237

Table of Contents

Advertisement

GENERATOR COIL RESISTANCE
Remove the left fuel tank side cover. (!7-5)
Disconnect the generator lead wire coupler.
Measure the resistance among the three lead wires.
If the resistance is not specified value, replace the stator coil
with a new one.
Also, check that the generator core is insulated.
# Generator coil resistance: 0.5
$ 09900-25008: Multi circuit tester set
) Tester knob indication: Resistance (Ω Ω Ω Ω )
GENERATOR NO-LOAD PERFORMANCE
Remove the left fuel tank side cover. (!7-5)
Disconnect the generator lead wire coupler.
Shift the transmission to the neutral position.
Start the engine and run it at 5 000 r/min.
Measure the AC voltage among the lead wires using the multi
circuit tester.
If the voltage is under the specified value, replace the AC gener-
ator with a new one.
# Generator no-load performance (when engine is cold):
$ 09900-25008: Multi circuit tester set
( Tester knob indication: Voltage (~)
1.2 Ω Ω Ω Ω
(Yellow
Yellow)
∞ Ω (Yellow
∞ Ω
∞ Ω
∞ Ω
Ground)
65 V and more (AC) at 5 000 r/min
ELECTRICAL SYSTEM
8-9

Advertisement

Table of Contents
loading

Table of Contents