Action
1. Install the rotor.
2. Set up sample and buffer
reservoirs and tubing lines
as described in the rotor
manual. Route the tubing
lines through the elutriator
port holes at the left side of
the door seal.
Close the centrifuge door.
3. Turn the ROTOR knob to
the JE position.
ROTOR
JA
JS
JLA
JSP
JV
JE
JCF
4. Enter the remaining run
parameters. Refer to the
JE-5.0 rotor manual for
rotor setup and operating
instructions.
Figure 3-2. Elutriation Controls
Result
5.0 appears in the ROTOR ID display.
The run is ready to begin.
DELAY
ELUTRIATOR
ROTOR ID
5.0
Operation
3-11