Day Schedule - Swegon GOLD RX Operation And Maintenance Instructions

Generation e rotary heat exchanger
Hide thumbs Also See for GOLD RX:
Table of Contents

Advertisement

6.4.3.3 Day schedule

Times and days can be set when the air handling unit is to run in
the high speed mode, low speed mode or be switched off.
For each day (Monday - Sunday), six different events can
be set to occur at a given point in time. Here, it is also pos-
sible to set six different events for two exceptions under
Ex1 and Ex2. The provisions for these exceptions can then
be set under Exceptions schedule, Calendar 1 and Calen-
dar 2.
Note that the preset event will not be carried over to the
next 24-hour period. If no event is set from 00.00 hours of
the next 24-hour period, the AHU will operate in the pre-
selected operating mode preset under Schedule settings.
Settings:
Value
Setting
range
Day
Mon/Tues/Wed/Thurs/Fri/Sat/Sun/Ex1/
Ex2
Time
00:00-23:59
Action
Inactive/Total stop/Low speed/High
speed/Normal Stop/ Extended Normal
Stop/Ignore
6.4.3.4 Exceptions schedule
Possible exceptions (Ex1 and Ex2), previously preset in the day
schedule can be set in the Exceptions schedule. Here you can
determine on which date or weekday the relevant exception shall
apply. If you select Calendar 1 or Calendar 2, which is the most
often the case, these can be set according to particulars in the
next section.
Settings:
Value
Exceptions schedule 1/2
Exceptions method
Date
Start date
Start weekday
Date range
Start date
Start weekday
Stop date
Stop weekday
We reserve the right to alter specifications without notice.
Factory
settings
00:00
Inactive
Setting
Factory
range
settings
Inactive/Date/Date
Calendar
range/Weekday/
1/2
Calendar 1/
Calendar 2
Year/Month/Day
Each day/
Each day
Monday/Tuesday/
Wednesday/
Thursday/Friday/
Saturday/Sunday
Year/Month/Day
Each day/
Each day
Monday/Tuesday/
Wednesday/
Thursday/Friday/
Saturday/Sunday
Year/Month/Day
Each day/
Each day
Monday/Tuesday/
Wednesday/
Thursday/Friday/
Saturday/Sunday
Day schedule
Exceptions schedule
Weekday
Start date
Start weekday
Calender 1
Calender 2
GB.GOLDSKE.160901
Mon 1-12/Odd/
Even/Each
Day 1-7/8-14/15-
21/22-28/29-31/
Latest 7 days/Each
day
Each day/
Each day
Monday/Tuesday/
Wednesday/
Thursday/Friday/
saturday/Sunday
See next chapter
See next chapter
www.swegon.com
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold pxGold cxGold sd

Table of Contents