6.4 Volume of Glycol/Water in Coil Heat Exchangers ......17 7. Appendices ............17 7.1 Declaration of Conformity ............17 7.2 Building Materials Declaration .............17 7.3 License ..................17 7.4 Ecodesign data ................18 The document was originally written in Swedish. www.swegon.com We reserve the right to alter specifications.
Only a qualified electrician or service personnel trained ing off the safety isolating switch before removing the by Swegon shall be permitted to carry out any work on safety guard. the electrical system or wire external functions in the air When the air handling unit is operating, the safety guards handling unit.
GB.GOLDSKFCX.231015 2. General 2.3 Mechanical Design The GOLD CX units are available in 4 physical sizes and for 8 2.1 Handling the air handling airflow ranges. The outer sheet steel skin is painted in Swegon’s grey metallic unit before commissioning colour (closest RAL colour: 9007).
26 Tappings for measuring pressure drop across the heat ex- duct) changer. GOLD CX, sizes 100/120: Pipework package including control box are supplied in unmounted condition for floor or wall mounting (accessories). www.swegon.com We reserve the right to alter specifications.
I-time if the heating regulation system is oscillating or operates sluggishly. This requires entering a special code. Contact your Swegon representative. 5. Activate, if needed, manual or auto operation (Dashboard) or lock the speed of the fans (AIRFLOW ADJUSTMENT image).
= flow reading (l/s) When commissioning has been completed, 3 air devices and one branch damper should stand fully open to obtain the lowest possible pressure in the K (Quotient) = system. www.swegon.com We reserve the right to alter specifications.
Order new filters from Swegon or your nearest Swegon repre- sentative. Specify the size of the GOLD unit, whether the replace- ment concerns one or two directions of airflow and if you are replacing standard filters and/or possibly a pre-filter.
If cleaning solvent is used, do not use solvent that will corrode aluminium or copper. Swegon's cleaning agent is recommended. This cleaning agent is sold by Swegon Service. While cleaning, check whether venting is necessary, check the content of glycol in the water and the condition of the coil for leakage.
A Service and Functionality Inspection Report must be performed according to the instructions in Sections 4.1, 4.2 and 4.3. General conditions for warranty liability are given in the delivery provisions applicable to the supply. www.swegon.com We reserve the right to alter specifications.
The max permissible common load on terminals 31-32, outputs for Heat/Cool and damper output (terminals 28-30) is max 32 VA (SD) eller 50 VA (RX/PX/CX). GOLD 100/120: If more than 16 VA is required, use wiring terminals 201 (G) and 202 (G0). Terminals 201-202 can be loaded with a total of max, 48 VA. www.swegon.com We reserve the right to alter specifications.
It is the combination of fan A and B that determines the fuse size. The air handling unit’s rating plate shows the combinations of fan sizes and capacity variants. Electrical connection is 3-phase, 5-wire, 400 V -10/+15%, 50 Hz. GOLD CX, size Fan A, size/capacity variant Fan B, size/capacity variant...
3 x 400 V, 50 Hz Motor shaft power: 3 x 10 kW, motor control system: 3 x 400 V, 50 Hz *) The motor controller limits the output power to the value specified. www.swegon.com We reserve the right to alter specifications.
The air handling unit’s rating plate shows the combinations of fan sizes and capacity variants. Fan combination Internal fuse protection (A) GOLD CX, Fan A, Fan B, Safety isolating...
66,8 61,9 66,9 9,71 5,30 1176 1560 Aluminium Domel ZKG Static 1,01 66,8 61,9 66,9 9,71 5,30 1176 1560 All documentation is available in digital form and can be downloaded from www.swegon.com www.swegon.com We reserve the right to alter specifications.