Tower Installation With Cap - Toshiba t1000 Installation And Operation Manual

Single phase - 6 kva
Hide thumbs Also See for t1000:
Table of Contents

Advertisement

6.3 Tower Installation with Cap

The Tower configuration modules are arranged side by side, and secured by a press-fit cap over the as-
sembly. If the optional Caster Kit is available, see Appendix E2 for installation.
1. Unpack the T1000 modules and set them in the desired location with the faceplates at the top as
shown below.
2. Facing the front of the modules, arrange them left to right in the following order (See Fig. 6-1 - 6-4):
Transformer Module (if available)
Power Module
Battery Module with output panel(if available)
Second Battery Module without output panel (if available)
NOTE: There is a Tower Cap for 2-, and 3-module tower systems. Fig. 6-7 shows Tower Cap instal-
lation for a 2-module system.
3. Press the T1000 Tower Cap over the tower modules (Fig. 6-7).
4. The T1000 tower is ready for interconnecting cable installation.
5. Go to Section 7 for cabling instructions.
A
FIGURE. 6-7: INSTALL CAP ON TWO MODULE TOWER SYSTEM
12
B
T1000 Series UPS Installation and Operation Manual – 91074-002
C

Advertisement

Table of Contents
loading

Table of Contents