1. Align the units and place the Tower Cap on the system.
2 module tower systems, see T1000 Installation and Operation Manual - 91074.
3-4 module tower systems, see T1000 Tower Cap Installation Instructions - 94037.
2. Use the leveling feet to remove weight from the casters. (Figure 5)
3.
The T1000 tower is ready for installing the interconnecting cables. See the T1000 Installation and
Operation Manual - 91074.
FRONT LOAD LEVELERS
FIGURE 5: USE LOAD LEVELERS TO STABILIZE TOWER ASSEMBLY
E-4
REAR LOAD LEVELERS
T1000 Series UPS Installation and Operation Manual – 91074-002