GE M
S
EDICAL
YSTEMS
D
2380207, R
IRECTION
EVISION
8-4-10-4
Removal Procedure (cont'd)
3.) Unscrew six (6) screws (6-11) to remove HUB Board Assy. Refer to Figure 8-38.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-17
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-11-7
8-4-10-5
Mounting Procedure
Install the new parts in the reverse order of removal.
8 - 36
7
7
8
9
Figure 8-38 Unscrew 6 screws
Functional Tests
Section
Functional Test / Diagnostic Test
OP Panel HUB Board Assy Validation
Section 8-4 - Keyboard Block
Power On/Boot Up
Power Off / Shutdown
LOGIQ™ 5 PRO S
ERVICE
10
11
12
Debrief Script
"Service Manual, Direction
2380207
, Rev 7+, Section 8-4-10.
Equipment passed all required tests and is
ready for use. "
M
ANUAL
Need help?
Do you have a question about the LOGIQ 5 PRO and is the answer not in the manual?