Encapsulation - GBC TITAN 110 Operation & Maintenance Manual

Hide thumbs Also See for TITAN 110:
Table of Contents

Advertisement

Applications

6.3 Encapsulation

Follow the procedure below to web the Titan 110/
165 for thermal encapsulation.
Materials need
• 2 rolls of thermal laminate
( both must be of same width )
• Enclosed blade
( i.e. Zippy™ knife )
• Leader board
( approximately 24 in. in length ( 61 cm ) )
• Images
( i.e. Inkjet, piezo, electrostatic, offset )
INFORMATION
The Titan 110 is used for illustration
purposes. The procedure is the same
for the Titan 165.
Ensure the roll of laminate is loaded
properly on the unwind shaft.
Exposed adhesive should be facing
away from the heated components.
This will prevent hours of cleaning!
Page 6 - 8
CAUTION
Titan 110/ 165 Operation and Maintenance Manual
a) Press power to " ON ".
b) Set TOP TEMPERATURE to 225
o
C ).
c) Set BOTTOM TEMPERATURE to 225
o
( 107
C ).
© GBC Films Group November 2000
o
F ( 107
o
F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Titan 165

Table of Contents