Drier Assembly/Installation; Gauge Cluster Removal/Disassembly - Honda GoldWing GL1100 Service Manual

1980 - 1983
Hide thumbs Also See for GoldWing GL1100:
Table of Contents

Advertisement

Clean ATF to the new O-rings.
Assemble the drier in the reverse order of disias:sernblly.
11
N'm
(8 ft·lb)
From Pump
I
To Main V81vej
~.'NG~~
To Gauge'
JOINTBOlT:
~.,
6 N'm (4 ft-Ibl
I
0
0 \\
~I
'O.RING(9.8
x
1.9
mml
O·RING
(4.8
x
1,9
mml
to the drier.
bolt to the
SPl~cltled
torque
the
values.
Connect the air hose
Install the 4.8
x
1.9 mm O-ring onto the joint boit and put
the
9.8 )( 1.9
mm
onto the drier.
Install the O-ring on the air hose (from the main
and
connect to the drier
the drier until the hose is
hand
-r:_, ..... _
the hoses and
Drier AssemblyIInstallation
Gauge Cluster Removal/Disassembly
NOTE: The
procedure pertains to the 1
Aspencade
The 1983- air gauge is contained in the LCD instrument
panel.
to page
18·27
for
1983-
instrument panel
Disconnect the front line at the right fork cap.
Disconnect the
rear
line.
Disconnect the pump sub-harness.
Remove the top compartment.
side cover.
Remove the
12·45

Advertisement

Table of Contents
loading

Table of Contents