Dsp Unit; I Ut-106 Dsp Unit - Icom IC-910H Instruction Manual

Vhf/uhf all mode transceiver
Hide thumbs Also See for IC-910H:
Table of Contents

Advertisement

11
OPTION INSTALLATIONS
I UT-106

DSP UNIT

The UT-106 provides AF DSP functions such as noise
reduction and auto notch.
Up to 2 DSP units can be installed for simultaneous
DSP operation for both MAIN and SUB bands.
When only 1 DSP unit is installed, DSP functions can
be operated in either the MAIN or SUB band,
whichever is being accessed.
NOTE: The insulating soft case is not used with the
IC-910H.
RECOMMENDATION:
When installing only 1 DSP unit, you can install into
either front or rear panel side. However, installing a
DSP unit into the front panel side may be easier and
also safer.
◊ Installing 1st DSP unit (front panel side)
q Remove the top and bottom covers.
• Remove the UX-910 if you have installed it. (p. 73)
w Remove the shielding plate.
e Remove the connection cable from J1751 on the
MAIN unit. Connect the cable into J1 on the
UT-106.
r Plug the connection cable (P1) from the UT-106 to
J1751 on the MAIN unit.
t Plug the flat cable into J3 on the UT-106 and to
J1771 on the MAIN unit.
• Take care of the conductor direction.
• Attach the Velcro tape to the UT-106 and PLL unit
shielding plate.
y Return the shielding plate, top cover and bottom
cover to their original positions.
Shielding plate
UT-106
Take care of the
conductor direction.
72
PLL unit
J3
J1
P1
J1751
J1771
MAIN unit
From The N3UJJ.COM Document Library
From The N3UJJ.COM Document Library
◊ Installing 2nd DSP unit (rear panel side)
q Remove the top and bottom covers.
• Remove the UX-910 if you have installed it. (p. 73)
w Remove the shielding plate.
e Remove the connection cable from J1761 on the
MAIN unit. Connect the cable into J1 on the
UT-106.
The cable between J1221 on the MAIN and J1
on the DSP unit, must be set in the groove of the
chassis (see diagram below).
Otherwise, the cable may be damaged when re-
turning the shield plate to its original position.
r Plug the connection cable (P1) from the UT-106 to
J1761 on the MAIN unit.
t Plug the flat cable into J3 on the UT-106 and to
J1781 on the MAIN unit.
• Take care of the conductor direction.
• Attach the Velcro tape to the UT-106 and PLL unit
shielding plate.
y Return the shielding plate, top cover and bottom
cover to their original positions.
Shielding plate
PLL unit
J3
UT-106
Take care of the
conductor direction.
MAIN unit
Set cable into the groove.
J1
J1
J1781
P1
J1761

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents