1.4 STORAGE OF BATTERIES
The batteries used in Synthesis™ are completely sealed, absorbed electrolyte, limited
maintenance storage batteries. This means that there is no access to the electrolyte for
specific gravity readings or for refilling. The battery is shipped fully charged,
interconnected, and ready for connection to the inverter system. Short-term storage, not to
exceed 120 days, of the battery should be in a clean, dry environment that does not
exceed 77° F. Keep jars and terminals clean and protected from physical damage.
1.5 SITE PREPARATION
This equipment must be installed on a clean, dry, level floor in a well-ventilated area. The
ambient temperature in the installation area must not exceed 90°F for Lead Battery
Systems. The site foundation must be capable of supporting 300 pounds per square inch.
Wall mounting of this equipment is not recommended.
Allow at least three (3) feet in front of and four (4) inches behind the cabinets for
ventilation and maintenance access space. Three (3) feet overhead clearance is required
for proper ventilation of the cabinets.
For the easiest connections, the Electronics Module should be
installed to the right of the Output Cabinet. For systems
purchased with extended run time, the Electronics module
should be located in the center, with the battery cabinet(s) on
the left and the Output Cabinet on the right.
NOTE:
Consider cabinet diagram
(Figures A and B) before
final system placement.
8
Need help?
Do you have a question about the SYNTHESIS and is the answer not in the manual?
Questions and answers