Page 31
All power connection must carried out by qualified licensed personnel experienced in wiring this type of equipment The safety ground wire must be connected before the power input cables The correct phase rotation (phase A leads B leads C) must be observed on the UPS terminals. In maintenance by-pass operation, the UPS components are de-energized, with the exception of input/output terminals,...