Remote Panel Installation - Westerbeke 9.0 BCG Technical Manual

Marine gasoline generators
Table of Contents

Advertisement

REMOTE PANEL INSTALLATION
INSTALLER'S/OWNER'S RESPONSIBILITY
1. Wiring between the generator set and either a remote start panel or remote instrument panel must comp-
ly with U.S. Coast Guard Safety Regulations 33 CFR-183.
2. The minimum voltage required at the starter solenoid is 9 volts. Therefore, wire gauges T83-1 and T83-2
should be selected to give a maximum voltage drop of 1 volt or less. This will provide 9 volts at the starter
solenoid when battery terminal voltage is down to 10 volts, indicative of a deeply discharged battery.
175
Westerbeke Generators

Advertisement

Table of Contents
loading

This manual is also suitable for:

7.9 bcg

Table of Contents