Lifting Instructions - Genie Z-135/70 Operator's Manual

Hide thumbs Also See for Z-135/70:
Table of Contents

Advertisement

Operator's Manual
Transport and Lifting Instructions
Observe and Obey:
Only qualified riggers should rig and lift the
machine.
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial label for the
machine weight.
59.5 in
1.5 m
60

Lifting Instructions

Fully lower and retract the primary and secondary
boom. Fully lower and retract the jib boom. Remove
all loose items on the machine.
Determine the center of gravity of your machine
using the picture on this page.
Attach the rigging only to the designated lifting
points on the machine. There are four lifting points
on the chassis.
Adjust the rigging to prevent damage to the
machine and to keep the machine level.
56 in
1.4 m
Z-135/70
Second Edition · Fourth Printing
Part No. 114474

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents