Initial Operation; Flushing The Heating System - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

6

Initial operation

6
Initial operation
This chapter describes how to start up the heating
system.
B Perform start up according to the user manuals for the
boiler, burner, low water indicator and electronic
heating circuit control.
B When handing over the system, show the operator how
it functions and how to operate it, and hand over the
technical documentation to them. Complete the
commissioning report.
B Draw the operator's attention to the maintenance
requirements and recommend arranging a
maintenance contract.
CAUTION: System damage due to heavy
dust deposits!
B Do not operate the boiler where heavy
dust contamination persists, e.g. through
building work inside the boiler room.
6.1

Flushing the heating system

Flush the heating system prior to commissioning to
prevent contamination that could e.g. block and damage
the circulation pump.
DANGER: Risk to health from drinking water
contamination!
B Always observe the regulations and
standards applicable in your country for
the prevention of contamination of
drinking water (e.g. by water from heating
systems).
B Observe EN 1717.
CAUTION: Boiler damage from corrosion
and sludge!
B It is essential to flush the entire heating
system before filling with heating water.
B Check the quality of the fill and top-up
water, so as to avoid scaling and
corrosion. (Note the "Water treatment..."
operator's log.)
If a heating system contains several heating
circuits, these must be flushed one after the
other.
34
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents