Fitting The Lagging - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

5
Installation of the boiler
5.9

Fitting the lagging

DANGER: Risk of injury due to burner door
falling off when opened!
B Make sure that both hinge bolts
(
Fig. 7, [1]) are inserted.
When fitting the insulation, ensure that the
fabric backing is arranged on the outside and
the cut-outs at the rear.
B Push the insulation underneath the boiler through to
the opposite side (
Fig. 7).
B Wrap thermal insulation jackets overlapping around the
boiler and fix at the top with 5 spring clips [3].
B Close off the cut-out for the low water indicator [1] with
two spring hooks [3].
B Undo the door bolts and open the burner door.
B Place the lower front insulation section on the front of
the boiler body and secure to the right and the left onto
the wrap-around insulation with 2 spring hooks on each
side [3].
B Locate the insulation strip [2] at the top around the
boiler shell ring, and secure to the right and the left
onto the lower front insulation section with two spring
hooks on each side [3].
B Place the upper front insulation section on the front of
the boiler body.
Keep the cut-outs for the hinges and the
threaded sleeves for the burner door bolts
free.
B Close the door again and secure with door bolts.
18
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Fig. 7
Push the insulation underneath the boiler
through to the opposite side.
1
Hinge pin
Fig. 8
Fitting and fastening the lagging
1
Low water indicator
2
Strip of lagging material
3
Tension springs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents