Inspection/Maintenance; General Notes; Preparing The Boiler For Inspection And Maintenance - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

8

Inspection/maintenance

8.1

General notes

Offer your customer an annual contract covering
inspection and demand-dependent service. Refer to the
"Inspection and maintenance reports" Chapter 8.6 for
information about what such contracts should contain.
The operator is obliged under the terms of
paragraph 9 of the heating plant legislation to
arrange to have the heating system cleaned
and maintained.
B The entire condensing unit (including any
neutralisation device) must undergo
maintenance once a year.
B We recommend arranging an inspection
and maintenance contract.
B For burner maintenance, follow the burner
manufacturer's maintenance instructions.
8.2
Preparing the boiler for inspection
and maintenance
B Shut down the heating system (
DANGER: Risk to life from electricution
when the heating system is open!
B Before opening the heating system,
disconnect the heating system from the
power supply by means of the emergency
isolation switch or the relevant circuit
breaker in the main fuse board.
B Prevent unintentional reconnection of the
electricty supply.
DANGER: Risk to life from gas explosion!
B Any work on components may only be
carried out by an approved contractor.
B Check the general condition of the heating system.
B Visually and functionally check the heating system.
B Check all system parts that carry fuel or water for leaks
and visible corrosion.
EN 303 permits an amount of leakage from
the hot gas side of the boiler.
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Chapter 7).
Inspection/maintenance
8
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents