Securing The Shield, Device Label And Data Plate; Connecting And Filling The Neutraliser; (Accesory) - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

5
Installation of the boiler
5.19 Securing the shield, device label and
data plate
B Fit the decorative panel [1] by inserting the hooks into
the front panel.
B Fix appliance insignia plate [2] to front panel.
B Attach the data plate [3] to either the left or right side
panel, depending on which is most convenient.
5.20 Connecting and filling the
neutraliser (accessory)
Please refer to the separate installation manual for
installation and maintenance of the neutralisation device.
B Fit the drain hose [1] with a hose clip to the condensate
outlet (siphon).
CAUTION: System damage!
You must ensure that the condensate
generally runs via the flue pipe into the boiler.
If this is not possible, you must only use
stainless steel or plastic tees in the separate
pipe inlet.
B In ceramic flue systems, you must fit a silt
trap (pot).
28
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Fig. 25 Attaching the data plate
1
Restrictor
2
Device label
3
Data plate
Fig. 26 Connecting and filling the neutraliser
1
Drain hose

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents