Installing Condensate Pipework - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

5.21 Installing condensate pipework

When installing the condensate pipework,
observe the following:
B Carefully drain the condensate created
inside the boiler and possibly in the flue
pipe.
B Drain the condensate into the sewerage
system in accordance with the
requirements in your country.
B Observe regional requirements.
B Fit the siphon provided to the outlet on the flue gas
collector [5].
B Unscrew the locking cap and fill the siphon with about
two litres of water.
DANGER: Risk to life from poisoning!
Siphons which are not filled with water, or
open connections, can cause a risk to life
from escaping flue gas.
B Fill the siphon with water.
B Ensure that the siphon and flue gas
connections are sealed.
B Ensure that the sealing disc with gasket is
seated in the locking cap.
Neutralisation devices are available as
accessories.
B Install neutralisation device (accessory) as
detailed in the installation instructions.
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Installation of the boiler
Fig. 27 Installing condensate pipework
1
Connection elbow
2
Locking cap
3
Siphon
4
Siphon outlet to neutralisation device or waste water pipe
5
Flue gas collector
5
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents