Inspection And Maintenance Reports - Buderus SB615 Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

8
Inspection/maintenance
8.6

Inspection and maintenance reports

The inspection and maintenance reports provide an
overview of the required inspection and maintenance
work.
B Initial and date the completed inspection work.
Inspection work
1.
Check the general condition of the heating system.
2.
Visual and function check of the heating system.
3.
Check the components in contact with fuel and water
throughout the system for the following:
• Tightness/leaks
• visible signs of corrosion
• Signs of ageing
4.
Check the combustion chamber and the heating surface
for contamination; shut down the system for this step.
5.
Check the burner.
6.
Check the flue for function and safety.
7.
Check the water pressure of the heating system and
pre-charge pressure of the diaphragm expansion vessel.
8.
If necessary, check the function of the DHW cylinder and
the magnesium anode.
9.
Check the control unit settings.
10.
Final inspection check; take measurements and docu-
ment figures and test results.
Confirm professional inspection with signature, date and company stamp
44
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
Page (individual steps)
page 39
burner documentation
burner documentation
page 43
DHW cylinder documen-
tation
control unit documenta-
tion
Comments

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus sb615 gas

Table of Contents