Polaris INDY TRAIL RMK Service Manual page 295

2002 deep snow
Table of Contents

Advertisement

SUSPENSIONS
Foxä Shock Maintenance
Assembly, Cont.
16. Install pressurizing valve with new O-ring and tighten
securely.
17. Set the nitrogen tank pressure regulator to 200 - 205
PSI.
18. Insert the Foxä Safety Needle and charge with
nitrogen to 200 PSI. Pull the needle straight outward
and remove from the pressurizing valve while holding
the pressure hose on the fitting. Do not insert the
needle again to check pressure as the volume inside
the gauge will reduce pressure in the shock.
19. As a final check, push the damper rod through a full
stroke. The damper rod must bottom out at full travel,
and then slowly rise to full extension.
movement
must
be
throughout the entire compression and rebound
stroke, without binding or loss of damping.
7.34
Shaft
smooth
and consistent

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents