Replacement
1)
Install the SPRING LATCH (PL 7.2) (Figure 1).
2)
Install the LEVER LATCH LEFT (PL 7.2) to PIPE LATCH FU (PL 7.2), then install them to CHUTE
LOW FU (PL 7.2) (Figure 1).
3)
Install the LEVER LATCH RIGHT (PL 7.2) to PIPE LATCH FU (PL 7.2) (Figure 1).
4)
Insert the projections of both the LEVER LATCH RIGHT (PL 7.2) and LEVER LATCH LEFT (PL
7.2) into the notch of the CHUTE LOW FU (PL 7.2), and install by rotating in the opposite direction
of the arrow (Figure 1).
5)
Install LEVER GATE HOLDER (PL 7.2), SPRING LEVER GATE (PL 7.2), and LEVER GATE FU
(PL 7.2) (Figure 1).
6)
Install the ROLL FU (PL 7.2) (RRP7.10).
7)
Install the CHUTE LOW FU to the COVER REAR 550, and secure it with the hook.
8)
Secure the CHUTE LOW FU to the COVER REAR 550 using the 5 screws (gold tapping, 6mm).
9)
Install the COVER REAR 500 (PL 7.1) (RRP7.9).
Chapter 3 Removal and Replacement Procedures (RRPs)
3 - 134