15. Switch on all main line switches for the AC section (ACS) in the power supply
system.
16. Confirm that the XSCF STANDBY LED (green) on the operator panel remains
lit. If it is blinking, wait until it remains lit.
17. Start (turn on power) all domains together. Take either of the following two
actions:
The power to all the domains is turned on, and then the power-on self test (POST)
is executed. When ok prompt displayed on the console of relevant domain, POST
is completed.
For details of the power-on operation, see
on page
Servers XSCF User's Guide.
18. Confirm that the replacement components are normal by using the
showhardconf or showstatus command of XSCF.
Unless "*" is displayed for the replacement XBU, it is operating normally.
For details of the showhardconf command and showstatus command, see the
SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide,
the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF Reference
Manual, or the man page.
Note – The showstatus command displays information on degraded components.
19. Restore the original mode switch setting on the operator panel.
Note – When the maintenance work is completed, be sure to confirm the mode
switch setting and return the switch to Locked.
20. Close the door on the server, and lock it.
17-8
SPARC Enterprise M8000/M9000 Servers Service Manual • June 2010
Press and hold down (for less than four seconds) the POWER switch on the
operator panel.
From a console that is connected to XSCF, execute the poweron -a command
of XSCF.
4-19, and the SPARC Enterprise M3000/M4000/M5000/M8000/M9000
Section 4.4.2, "Powering the Server On"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m8000

Table of Contents