Fujitsu SPARC ENTERPRISE M9000 Service Manual page 180

Fujitsu server user manual
Hide thumbs Also See for SPARC ENTERPRISE M9000:
Table of Contents

Advertisement

b. Exit the maintenance menu.
18. Configure the CMU into the system.
Active replacement:
Hot replacement:
19. Confirm that the replacement components are normal by using the
showhardconf or showstatus command of XSCF.
Unless "*" is displayed for a replacement CMU, CPU, or DIMM, it is operating
normally.
For details of the showhardconf command and showstatus command, see the
SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide,
the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF Reference
Manual, or the man page.
Note – The showstatus command displays information on degraded components.
20. Close the door on the server, and lock it.
6-22
SPARC Enterprise M8000/M9000 Servers Service Manual • June 2010
Use the addboard command to dynamically configure the relevant CMU into
a domain. Perform this operation for all the domains that have been recognized
in
Step 2
as including the CMU to be replaced.
For details, see
Section 4.2.2, "Disconnecting and Replacing a FRU" on
page
4-5, and the SPARC Enterprise M4000/M5000/M8000/M9000 Servers
Dynamic Reconfiguration (DR) User's Guide.
From the console that is connected to XSCF, execute the poweron -d
command of XSCF to turn on power to the domain.
When the power to the domain is turned on, version synchronization of
OpenBoot PROM (OBP) is automatically performed. When version
synchronization is completed, the power-on self test (POST) is performed.
When ok prompt displayed on the console of relevant domain, POST is
completed.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m8000

Table of Contents