FIGURE 10-3
OPNL
Base cabinet
TABLE 10-1
TABLE 10-1
Model name
M8000/M9000 Operator Panel
10.2
Cold Replacement
In cold replacement, none of the replacement work is performed with the
maintenance menu from a terminal connected to XSCF.
The procedure is as follows.
1. Unlock and open a door of the server.
For details, see
10-4
SPARC Enterprise M8000/M9000 Servers Service Manual • June 2010
OPNL Mounting Location (Front of M9000 with the Expansion Cabinet)
lists the abbreviated name of the OPNL.
Abbreviated Name of the Operator Panel
Chapter
5.
Expansion cabinet
Abbreviated name
OPNL