Honda VFR800F 2014 Service Manual page 147

Table of Contents

Advertisement

FUEL SYSTEM
lnstallation
is
in
the
reverse order of removal.
NOTE:
.
The
insulator
is
installed with the
"Up"
mark
facing
up. Be
sure
that all the
band screw heads
[1]
are
facing to
the
left and each band hole [2]
is
aligned
with the locating
pin.
.
Apply engine
oil to the
mating
surJaces
of
the
insulator.
.
lnstall
the
insulator, aligning
the
groove with
the
lug.
.
Tighten the rnsulator band screws
so
the distance
[3]
between
the
band ends
is
the specified value.
.
Connect
the
injector
2P
(Gray) connectors
in
their
correct injectors (page
7-14).
.
When installing
the fuel feed hose,
replace
sealing washers
with new ones and align
the
with
the
groove.
TORQUE:
Throttle cable holder socket bolt:
3.4 N.m
(0.3
kgf.m,2.5lbf.ft)
Fuel feed hose
sealing
nut:
22 N.m
(2.2kgf.m,16 tbf.ft)
Throftle drum cover socket bolt:
3.4
N'm
(0.3
kgf.m,2.5 lbf.ft)
Check the throttle grip freeptay (page
3-4).
Fill
and
bleed
the
cooling
system
(page 8-5).
the
tab
7
-16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vfr800fd 2014Vfr800f 2015Vfr800fd 2015

Table of Contents