Setting The Tray Id - Sun Microsystems StorageTek 5320 Getting Started Manual

Nas appliance and gateway system
Table of Contents

Advertisement

Caution – The cabinet must have two power sources connected to two separate
power circuits.
3. Connect each power supply in the Sun StorageTek 5320 NAS Appliance to a
separate power source in the cabinet.
After connecting the server power cords to the power source, the Power/OK LED
flashes indicating standby power mode.
4. Connect the primary power cables from the cabinet to the external power source.
Note – Do not power on the units until you complete the installation procedures for
your system. The power-on sequence is described in detail in
StorageTek 5320 NAS Appliance, Controller Enclosures, and Expansion Enclosures"
on page
67.

Setting the Tray ID

You set the tray ID using the Tray ID switch at the back of the expansion enclosures
and controller enclosures. You must set the tray ID of each enclosure to a unique
number from 00 to 77.
Chapter 2 Installing Servers and Back-End Storage
"Powering On the Sun
49

Advertisement

Table of Contents
loading

Table of Contents