6. At the back of the enclosure, install and tighten two 8-32 screws (one per side) to
secure the back of the enclosure to the cabinet (
Securing the Enclosure to the Back of the Cabinet
FIGURE 2-13
Installing a Server in a Cabinet
Installing a server involves three steps:
1. Installing the slide rails (refer to
2. Installing the cable management kit (refer to
Kit" on page
41)
3. Verifying the operation of the slide rails and cable management (refer to
Verify the Operation of the Slide Rails and the CMA" on page
FIGURE 2-13
"To Install the Slide Rail Assemblies" on page
"To Install the Cable Management
Chapter 2 Installing Servers and Back-End Storage
).
"To
45)
34)
33