Panasonic WH-ADF0309J3E5CM Service Manual page 109

Table of Contents

Advertisement

12.1.3.5
Checking the Drainage
12.1.3.5.1
Horizontal Installation Only
After wiring and drain piping are completed, use the following procedure to check that the water will drain smoothly.
For this, prepare a bucket and wiping cloth to catch and wipe up spilled water.
(1) Connect power to the power terminal board (L/1, N/2 terminals) inside the electrical component box.
(2) Remove the tube cover and slowly pour about 1,200 cc of water through the opening into the drain pan to check
drainage.
(3) Short the check pin (CHK) (6P : 1-4) on the indoor unit control PCB and operate the drain pump. Check the water
flow through the transparent upper drain port and see if there is any leakage.
* If the check pin (CHK) (6P : 1-4) is shorted, the fan starts rotating at high speed and could cause injury.
(4) When the drainage check is complete, open the check pin (CHK) (6P : 1-4) and remount the insulator and the
cap onto the drain inspection port.
12.1.3.6
Connecting Duct to Air Intake Port Side
(1) Install the duct (field supply).
See the figure for the dimension of the installation hole.
Use M4 self-tapping screws for installation.
80.6
183
12-ø3.2 hole
For M4 self-tapping screw
80.6
260
43
80.6
53
To get clean air and to extend the service life of the air conditioner, an air filter must be installed in the air intake.
For installation and cleaning the air filter, consult your dealer or service center.
Water intake
Cap
8-ø3.2 hole
For M4 self-tapping screw
340
183
300
260
300
280
320
300
320
280
Transparent upper drain port
Drain inspection port
43
14-ø3.2 hole
For M4 self-tapping screw
300
300
53
109
Remove the cover plate
(Only S-3650PF3E)
Unit: mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-71wf3eCu-2wz71ybe5

Table of Contents