Installing the generator and the stand
Installing the cable ducts
1.
2.
3.
Fig. 3 Installing the cable ducts (top view)
1.
2.
NOTICE
3.
4.
Installations with separate control console
For the connection cable separate control console – generator, additional cable ducts are
required, unless the cables are to be laid underfloor.
Siemens-Elema AB
Solna, Sweden
Position the cable ducts (1) to the stand and the generator respectively.
Leave sufficient space, approx 10 mm between the cable ducts (1) and the base
plate of the stand (3) to allow for the mounting of the cable outlet cover (4).
Check that the cable duct (1) is slightly overlapped by the cable outlet cover (4).
4
3
Mark the outlines of the cable ducts (1) on the floor.
Cut the bottom of the cable ducts (6) and the cable duct cover (5) to proper length.
Fig. 3 shows a right-angled installation of the cable ducts. If the
generator is to be installed at an other angle to the stand, you just
have to cut the cable ducts correspondingly.
Fasten the bottom plate of the cable ducts (6) to the floor according to marking,
using double-sided adhesive tape.
At the generator, cover the cable entry not used with the enclosed cover plate (7).
Register 3
1
10 mm
SP B7-230.033.07
Rev. 03
11.99
1
7
Page 3 of 6
Mammomat 1000/3000
SPS-UD
Installation and Start-Up
4 - 3
4
5
6
4