Meters And Appliances, Tools; Meters And Appliances Required; Tools Required - Siemens MOMMOMAT 1000 Installation And Start-Up Instructions Manual

Table of Contents

Advertisement

Prerequisites

Meters and appliances, tools

Meters and appliances required

NOTICE
Power Line Impedance Meter 84 28 104 RE999.
Protective ground-wire tester 44 15 899 RV090.
Oscilloscope, e.g TEKTRONIX 314.
Digital multimeter incl. mAs meter.
Densitometer e.g PDA 81.
Service PC (e.g Siemens-Nixdorf PCD 3NSX/20 or similar) with connecting cable (PC-
Generator), part no. 99 00 440 RE999.
Normi 7 test body (provided by the customer) or SIB phantom Type 42 001 (PTW or
INAK).
Centering cross, part no. 96 60 051 RE 999.
Plexiglass plates, three plates measuring150 mm x 20 mm x 20 mm and one plate
measuring 150 mm x 150 mm x 10 mm, part no. 85 49 438 and 97 88 423 respectively.
WARNING

Tools required

Standard installation tool kit.
Torque wrench for bolting the stand/generator to the floor (optional).
Electrical screwdriver with adjustable torque is recommended.
NOTICE
Siemens-Elema AB
Solna, Sweden
Calibrated instruments are required.
For safety reasons, the existing protective ground conductor in
the power cord must under no circumstances be disconnected
when operating the oscilloscope. For those measurements, in
which any resulting ground loop may falsify the measuring result,
use the differential amplifier (difference measurement).
Checks and/or adjustments, which must be made with X-ray
radiation switched on, are marked with the warning symbol:
Register 3
SP B7-230.033.07
Rev. 03
Page 3 of 6
11.99
SPS-UD
1 - 3
1
1
1
Mammomat 1000/3000
Installation and Start-Up

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mammomat 3000

Table of Contents