JLG 1200SJP Service Maintenance Manual page 249

Hide thumbs Also See for 1200SJP:
Table of Contents

Advertisement

7. Tag and disconnect the three electrical wires that run to
the power track and the wire that goes to the proximity
switch.
8. Unbolt the power track.
9. Remove the bolt securing the keeper pin and remove
the keeper pin from boom pivot pin.
3121142
10. Using the lifting device, support the rear of the boom to
remove the load from the pivot pin.
11. Remove the boom pivot pin.
12. Move all of the hydraulic hoses and electrical wires so
they are free from chassis.
– JLG Lift –
SECTION 4 - BOOM & PLATFORM
4-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

1350sjp

Table of Contents