SECTION 3 - CHASSIS & TURNTABLE
6. Loosen the M10x25 flathead socket screws and remove
the planetary ring without damaging the O-Ring.
7. Remove the release joint together with the spring.
8. Disassemble the Ø40 outer snap rings and using an
extractor remove the planetary gears from the spindle
pins.
3-58
9. Loosen the M6x6 socket headless screws and also
remove the 3/16" balls.
10. Loosen the ring nut using the special wrench.
11. Remove the hub support together with the roller bear-
ing inner track.
– JLG Lift –
3121142