JLG 1200SJP Service Maintenance Manual page 141

Hide thumbs Also See for 1200SJP:
Table of Contents

Advertisement

NOTE:
If the end cover has a valve (24) or has five bolt holes, use
the line you previously scribed on the cover to radially align
the end cover into its original position.
21. Assemble the 5 or 7 special bolts (1) and screw in finger
tight. Remove and replace the two alignment studs with
bolts after the other bolts are in place. Alternately and
progressively tighten the bolts to pull the end cover and
other components into place with a final torque of 22-26
ft. lbs. 45-55 ft. lbs.(61-75 N m) for the seven 3/8-24
threaded bolts.
3121142
NOTE: The special bolts required for use with the relief or shuttle
valve (24) end cover assembly (2) are longer than the bolts
required with standard and cover assembly. Refer to the
individual service parts lists or parts list charts for correct
service part number if replacement is required.
22. Torque the two shuttle valve plug assemblies (21) in end
cover assembly to 9-12 ft. lbs. (12-16 Nm) if cover is so
equipped.
Torque the two relief valve plug assemblies (21) in end
cover assembly to 45-55 ft. lbs.(61-75 Nm) if cover is so
equipped.
– JLG Lift –
SECTION 3 - CHASSIS & TURNTABLE
3-95

Advertisement

Table of Contents
loading

This manual is also suitable for:

1350sjp

Table of Contents