JLG 1200SJP Service Maintenance Manual page 107

Hide thumbs Also See for 1200SJP:
Table of Contents

Advertisement

9. Now check the unit roll torque and proceed in the fol-
lowing order:
10. 7.) By keeping the spindle locked, apply a setting pre-
load by tightening the ring nut at 40daNm, turn com-
pletely the hub support twice using the special wrench
to recover any bearing cage misalignments. Release and
tighten the ring nut at the final torque of 30daNm (alter-
nate tightening and some setting turns). Check the roll
torque with seal which must be within 1÷1,5 daNm.
NOTE: Place the ring nut with its convex part facing the roller
bearing as shown below.
3121142
11. Using the special tool and hammer make four dents on
the spindle thread by the M6 holes of the ring nut.
12. Fit the 4 3/16" balls and tighten with LOCTITE 243 the 4
M6x6 socket headless screws at the torque of 1daNm.
13. Fit the bearings onto the 3rd stage planetary gears and
using a spacer mounting mount everything on the spin-
– JLG Lift –
SECTION 3 - CHASSIS & TURNTABLE
3-61

Advertisement

Table of Contents
loading

This manual is also suitable for:

1350sjp

Table of Contents