Stopping The System From The Operation Panel - Fujitsu Oracle M10-1 Service Manual

Hide thumbs Also See for Oracle M10-1:
Table of Contents

Advertisement

00 : Powering off
The following processes are performed.
- Oracle Solaris is completely shut down.
- The system stops and enters the POWERON READY state (The XSCF is running).
Note - The order in which guest domains shut down depends on the shut-down group
setting of Oracle VM Server for SPARC.
4.
Check that the POWER LED on the operation panel is off.
5.
Execute the showpparstatus command to confirm that the power to the
physical partition is turned off.
In the following example, [PPAR Status] of PPAR-ID 00 displays "Powered Off",
which indicates that the power to the physical partition has been turned off.
XSCF> showpparstatus -a
PPAR-ID
00
6.
Execute the showdomainstatus command to confirm the operating condition
of the logical domain.
In the following example, [Status] of the logical domain displays "Solaris
powering down," indicating the power-off processing of Oracle Solaris.
XSCF> showdomainstatus -p 0
Logical Domain Name
primary
5.5.2

Stopping the system from the operation panel

1.
Confirm that the mode switch on the operation panel is in Service mode.
Press the power switch on the operation panel for 4 seconds or more.
2.
For details, see
3.
Check that the POWER LED on the operation panel is off.
4.
Execute the showpparstatus command to confirm that the power to the
physical partition is turned off.
In the following example, [PPAR Status] of PPAR-ID 00 displays "Powered Off",
which indicates that the power to the physical partition has been turned off.
XSCF> showpparstatus -a
PPAR-ID
00
PPAR Status
Powered Off
Status
Solaris powering down
"2.3.2 Control function of the operation
PPAR Status
Powered Off
Chapter 5 Preparations Required for Maintenance
panel."
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m10-1

Table of Contents