Initial Meridian 1 installation
553-3001-210 Standard 14.00 June 1999
15 Replace all covers and grills on the front and rear of the system.

Table 1

Initial system installation—list of tasks in subsections
Task
Prepare equipment for installation
Place the fourth module on a column
Position and level equipment
Install overhead cable tray kits
Install power supplies in all modules*
Install the disk drive unit(s)*
Install power equipment and ground wiring
AC power
DC power
Plan and designate the MDF
Install PFTUs
Configure the system monitor
Connect a system terminal (or modem)
Cable common equipment
Cable network loops
Cable lines and trunks
Power up the system and load system software
Perform acceptance tests
* See "System installation procedures" on page 12 and 2-3 for details on tasks that
are not described in subsections.
Go to
page 15
page 23
page 27
page 33
page 35
page 45
page 67
page 83
page 91
page 105
page 133
page 177
page 203
page 299
page 305

Advertisement

Table of Contents
loading

Table of Contents