Initial Meridian 1 installation
553-3001-210 Standard 14.00 June 1999
15 Replace all covers and grills on the front and rear of the system.
Table 1
Initial system installation—list of tasks in subsections
Task
Prepare equipment for installation
Place the fourth module on a column
Position and level equipment
Install overhead cable tray kits
Install power supplies in all modules*
Install the disk drive unit(s)*
Install power equipment and ground wiring
AC power
DC power
Plan and designate the MDF
Install PFTUs
Configure the system monitor
Connect a system terminal (or modem)
Cable common equipment
Cable network loops
Cable lines and trunks
Power up the system and load system software
Perform acceptance tests
* See "System installation procedures" on page 12 and 2-3 for details on tasks that
are not described in subsections.