Nortel Meridian 1 Manual page 100

System installation procedures
Table of Contents

Advertisement

Page 62 of 500
Installing DC power
Figure 33
PDU to System 600/48 Power Plant connections
Alarm & Control
Circuit Pack
8
EQL
7
EQL
6
LVA
NO
5
LVA
C
4
LVA
NC
3 LVDA
NO
2 LVDA
C
1 LVDA
NC
TB2
8
FA
NC
7
FA
C
6
FA
NC
5 RFA MAJ NO
4 RFA MAJ NC
3
RJA MN
NO
2 RFA MN NC
1
RFA
C
DC ON 0–1 wire - Black
DC ON 1.1.3–3 wires
Alarm - 1 wire - Orange
To NT8D22 System Monitor
via NT8D46AV, BV, or CV cable.
Note: Do not connect the trip leads.
553-3001-210 Standard 14.00 June 1999
System 600/48 Distribution
& Control Panel
To BLO (blower),
CB0 (module 0),
& CB1 (module 1)
To CB2 (module 2)
& CB3 (module 3)
BAT
BAT
0/1
2/3
Common ground BUSBAR/LRE
(Battery/Logic Return) (+)
DISCH BAT (BUSBAR0
Common feed FO CB's
To connections
in pedestal
+
+
RTN
RTN
LRTN
0/1
2/3
NT6C14GI
CHG BAT BUSBAR
SHUNT
LVD
CONTRACTOR
QFF (0–5A) fuse blocks
(4 places)
TB1 in
PDU
Factory installed
inside pedestal
553-5925

Advertisement

Table of Contents
loading

Table of Contents